Signing a building contract feels like the finish line, but for most Gold Coast buyers it is really the starting gun. Once the ink is dry, your money starts moving in stages, and understanding exactly how those stages work is what separates a smooth build from a costly surprise.
Progress payments are not just a builder preference. They are a lender-regulated process tied directly to how a construction loan releases funds. Whether you are building in Robina, on a new estate in Reedy Creek, or on a knockdown-rebuild block in Burleigh Waters, the mechanics are the same, and the risks concentrate in a few specific moments most buyers are not warned about.
The construction loan structure you choose, and the contract you sign, lock in how that risk is shared between you, your builder, and your lender before the slab is even poured.
Key takeaways
- Construction loans release funds in stages, not as a lump sum.
- Lenders inspect before each progress draw; a front-loaded schedule can be rejected.
- You pay interest only on the amount drawn, not the full approved loan.
How do builder deposits and progress payments work on the Gold Coast?
A construction loan does not hand you the full approved amount on settlement day. Instead, funds are released in stages that match the build’s progress, with the lender inspecting the property at key milestones before releasing the next draw. You pay interest only on the amount drawn so far, not on the full loan balance, which keeps your repayments low during the build and steps them up as the home takes shape.
Source: APRA.
What does a standard construction loan progress payment schedule look like?
Most lenders follow a six-stage progress draw structure, though the percentages can vary slightly between lenders and builder contracts. The standard industry shape is broadly consistent and is what lenders use as a benchmark when assessing whether your builder’s schedule is acceptable.
The six stages and their typical share of the total build cost:
- ›Deposit: 5% at contract signing, paid before the lender draws begin.
- ›Slab or base: 10% to 15% once foundations are laid and inspected.
- ›Frame: 20% at frame completion, usually the largest single draw.
- ›Lock-up: 20% when the roof, windows and external doors are in place.
- ›Fit-out or fixing: 30% covering internal fit-out, plastering, joinery and fit-out trades.
- ›Practical completion: 10% on handover, once the Certificate of Occupancy is issued.
What catches people out most often is the builder’s contract schedule looking reasonable at signing, then the first progress invoice arriving and the lender’s inspector saying the work does not match the draw amount. The delay that follows can be weeks, and the builder does not stop charging holding costs while it is sorted.
Jason Cuerel · Principal Mortgage Broker, Mortgage Innovations · Chat to Jason →
What do you need to qualify for a construction loan on the Gold Coast?
Construction loans carry a slightly higher documentation burden than a standard home loan, because the lender is not just assessing your ability to repay, it is assessing the viability of the build itself.
What lenders will want to see before they approve:
- ›Fixed-price building contract: signed with a licensed builder, itemising the progress schedule and the total contract price.
- ›Council-approved plans: development approval or a building permit, depending on the project type.
- ›Builder’s licence and insurance: the lender verifies the builder holds a current Queensland Building and Construction Commission licence and adequate home warranty insurance.
- ›Land ownership or simultaneous settlement: most lenders require you to own the land, or settle the land and construction loan simultaneously.
- ›Standard income and credit evidence: payslips, tax returns, employment confirmation, and your credit file, assessed under the usual serviceability rules.
What does a construction loan cost during the build on the Gold Coast?
The interest-only mechanic during construction is one of the genuine advantages of this loan type. Because you pay interest only on the amount drawn, your repayments start small and grow with each stage. On a $700,000 construction loan, the repayment after the slab draw is a fraction of what it will be at practical completion.
Once the build is complete, the loan converts automatically to a standard principal and interest home loan, and repayments step up to reflect the full drawn balance. If your build runs to 12 months, that is 12 months of lower repayments while the home is being built.
You should also budget for the lender’s inspection fees at each stage draw, valuation costs at the beginning, and any cost overruns that sit outside the fixed-price contract. Lenders generally will not release additional funds above the approved amount, so any variation or variation-cost is your responsibility to fund separately.
Source: APRA.
|
Get in touch Need help with a construction loan? We’re a local team who understand how lenders actually assess your situation, not just your rate. We’ll compare your options across 60+ lenders to find the right fit. Or call 07 5535 5882 |
How long does a construction loan take to get approved and drawn?
Approval typically takes two to four weeks from full application, which is similar to a standard home loan. What differs is what happens after approval.
Each stage draw requires the builder to issue a progress claim invoice, you to sign a draw request, and the lender to send an inspector to verify the work has reached the claimed stage. That inspection and fund-release cycle commonly takes five to ten business days per draw. On a six-stage build, that is six inspection cycles across the life of the project.
Delays concentrate at two points: the frame draw, where the work is often more advanced than the inspector’s visit date, and the practical completion draw, where outstanding defects can hold up the Certificate of Occupancy and therefore the final payment. Building in lead time on both is worth doing before you commit to a completion date with your builder.
When does a construction loan not make sense?
If you are buying a finished new home from a developer, a standard home loan is usually the right structure. Construction loans exist for builds that require staged funding, and a finished property does not need it.
Substantial renovations to an existing home can sometimes be funded through a construction loan, but many lenders prefer a redraw facility on an existing loan or an equity release from the current property for renovation work. The right answer depends on how the work is contracted and whether a fixed-price contract is in place.
A construction loan is also less suitable where the builder’s schedule is heavily front-loaded. A draw schedule requesting 25% at slab and 35% at frame exceeds the standard and will usually be rejected or renegotiated by the lender before approval. If your builder’s contract looks like that, it is worth flagging before you sign, not after.
How to manage builder deposits and progress payments on the Gold Coast, step by step
Step 1: Talk to us
We start by assessing your land and build costs together, checking whether your builder’s progress schedule matches what lenders will accept, and working out which construction loan structure suits your situation.
Step 2: Get formal approval before signing the building contract
We submit your application with the fixed-price contract, plans and builder credentials, and the lender issues formal approval covering both the land and the construction component before you are committed.
Step 3: Manage the draw process through the build
We help you co-ordinate each stage draw, from the builder’s progress claim through to the lender inspection and fund release, so the payments clear on schedule and the build is not delayed by a paperwork gap.
Step 4: Transition to your standard home loan at completion
At practical completion we confirm the loan has converted correctly to principal and interest, review whether the structure still suits your position, and connect you with any refinancing option if your circumstances have changed during the build.
What goes wrong with builder deposits and progress payments?
Where buyers lose ground:
- ›Signing a contract before finance is approved: if formal approval is not in place, a builder’s contract is a commitment the lender may not match, leaving you exposed to contract-variation costs or deposit loss.
- ›A front-loaded draw schedule: builders sometimes structure contracts to receive more money earlier, which works for them and creates a shortfall risk for the buyer if the lender rejects or adjusts the schedule at approval stage.
- ›Cost variations without a funding plan: a mid-build variation is not covered by the approved loan amount. Without a plan for where those funds come from, a variation can stall the build or force an emergency refinance at the worst possible moment.
Where I would focus before a client signs anything is the draw schedule and the variation clause. Those two items decide how much financial exposure sits with the buyer if anything shifts during the build. A builder with a well-structured schedule and a clear variation process is worth more than a cheaper tender with no payment detail.
Jason Cuerel · Principal Mortgage Broker, Mortgage Innovations · Chat to Jason →
Frequently Asked Questions
Can I use the Queensland First Home Owner Grant on a construction loan?
Yes, the $30,000 Queensland First Home Owner Grant applies to new homes, including owner-built and contract-built homes, where the contract is signed between 20 November 2023 and 30 June 2030 and the property value is under $750,000.
Who holds my builder deposit before construction starts?
Under Queensland building law, the builder holds the deposit, not a trust account, once the contract is signed. This is a key reason formal finance approval before signing matters, as the deposit is at risk if the build does not proceed.
What happens if the lender’s inspector and my builder disagree on the stage reached?
The lender’s inspector’s assessment determines what is released. If the builder’s claim exceeds what the inspector confirms, the payment is adjusted or held until the stage is complete, which can cause delays and builder holding cost claims.
Can I fix my construction loan interest rate during the build?
Most lenders keep the construction period on a variable rate, because the drawdown amount changes each stage and a fixed rate is difficult to price against an uncertain balance. Some lenders allow a rate lock for a fee at approval stage.
Is a construction loan the same as a house and land package loan?
A house and land package typically uses a construction loan for the build component, with the land settled separately first or simultaneously. The mechanics are the same; what differs is whether the land and construction are contracted together or separately.
Should I use a mortgage broker or go directly to a lender for a construction loan?
A mortgage broker, every time. Not every lender accepts every builder’s draw schedule or contract format, and the difference between lenders on construction policy is larger than on standard home loans. Comparing across a panel before you apply protects you from a rejection sitting on your credit file.
Your Next Steps
Builder deposits and progress payments are where construction finance gets specific, and the details in your building contract matter as much as the loan itself. A draw schedule that does not align with your lender’s requirements, or a variation clause that puts cost risk entirely on you, can turn a straightforward build into a stressful one.
The right time to check all of this is before you sign. Talk to the Mortgage Innovations team or call 07 5535 5882, and we’ll compare your options across 60+ lenders and review your builder’s contract structure before you commit.
|
External Resources
Mortgage Innovations · the Gold Coast · Mortgage Innovations Pty Ltd (ACN 128 840 040), authorised under Australian Credit Licence 517192 · General information only – this article does not constitute financial advice. Please consider your own circumstances and seek professional advice before making any financial decisions.

Arranging and securing your home loan finance can be stressful, especially with some lenders now taking extra steps including going through your living expenses and credit scoring, ouch! Sometimes banks can make you feel like ‘just a number’ too, that’s why we want to do things differently: because you deserve better.
As local, family-owned Gold Coast Mortgage Brokers our team takes the time to listen, answer your questions and make getting your home, car or equipment loan as easy as possible.